Australian
Screen

an NFSA website

Snowy Hydro – The Snowy–Murray Development (1969)

play
clip The construction of Island Bend Dam

This clip chosen to be G

Clip description

The process by which Island Bend Dam, on the eastern side of the Snowy-Murray Development, was built is shown step by step.

Curator’s notes

Shot over the construction period of Island Bend Dam in the Snowy Mountains Scheme, between 1954 and 1965, the segment demonstrates how river flow is controlled during dam construction and the steps in building a concrete gravity dam. Methods used to counter the problems of access, altitude and temperature are illustrated.